You cannot bring an industrial site to a negotiating table. Two asphalt plants, a concrete plant, a private rail spur and 5.85 hectares of land one kilometre from the Moscow Ring Road stand in Kotelniki, while the decisions about them are made by people who have never been there.
one shooting day at a working plant - and the complex can be shown to someone who has never been there: a 24-slide presentation and a 2:25 film in 4k with infographics.
project team
Angelinaproject manager
Valeriaweb designer
client
niche
year
client's website
what we did
result
Background
You cannot bring an industrial site to a negotiating table. Two asphalt plants, a concrete plant, a private rail spur and 5.85 hectares of land one kilometre from the Moscow Ring Road stand in Kotelniki, while the decisions about them are made by people who have never been there.
ABZ Kotelniki is a property and production complex in the Silikat industrial zone: asphalt and concrete production with its own rail intake. The two asphalt plants together turn out 400 tonnes of mix per hour, the concrete plant 80 cubic metres. The site has a 6,000 m³ bitumen store, eight buildings and structures with a total area of 4,142 m², more than two hundred road-building machines and 2 MW of allocated electrical capacity.
The brief sounded simple: in a single shooting day, film the plants, the machinery, the rail siding, the warehouses and the staff facilities - and turn the footage into materials that show the complex without a site visit. The final set is a 24-slide presentation and a film of 2 minutes 25 seconds in 4K.
The task
The presentation was made for an investor. That is a particular kind of reader: adjectives are of no use to them, only things that can be checked.
A person assessing a production complex asks the same questions, and almost always in the same order:
- how much land there is and what its status is;
- what equipment is installed and how much it produces;
- how raw materials reach the site and where they are stored;
- whether there is in-house machinery, a laboratory, repair facilities;
- where the people who run all this live and eat;
- whether electricity and gas are already connected.
Hence two materials with different jobs. The film is the first contact: in two and a half minutes a person understands what this place is, where it is and how big it is. The presentation is the verification: people go through it point by point, come back to the figures, forward it to colleagues.
Since the site cannot be brought to the reader, it has to be shown so that every statement sits next to a frame and a figure.
A brief instead of “just come and shoot”
Both materials are built from one shoot, and a shooting day at a working plant cannot be repeated. So everything depends on preparation - and we started not with a camera but with documents.
The general brief, 12 October. Twelve sections: the territory and the objects, the list of deliverables, a shot list by location, photography, the presentation, people in the frame, technical requirements, safety and access, stages and acceptance, what is needed from the client. The site was divided into eight zones and each was given a priority: the plants, the control rooms and the laboratory, the machinery fleet and the rail siding - high; the workshops and staff facilities - medium. If the day goes off plan, it is clear what to sacrifice.
For each location we wrote down a minimum: a wide shot, a medium shot, three to five close details, a shot with camera movement and a shot with a person. It is a dull line, but it is exactly what saves the edit later: from any point of the site there is something to open with, something to continue with and something to end on.
The photographer's brief, 19 October. This is the key technique of the whole project: the shot list is written not by location but by future slide. Every line is a slide that does not exist yet: the cover, the asphalt plants, the concrete plant, the laboratory, the machinery fleet, the rail siding, the team, the conditions for staff. The photographer arrives on site knowing what every frame is for.
The requirements for the frames follow from the same idea:
- most of the shots are horizontal, with empty space at the side or at the top, so that a heading and a figure fit in;
- a person next to a plant or a machine, otherwise the scale does not read;
- textures shot separately - crushed stone, sand, asphalt, metal in close-up - as backgrounds for text;
- people in the frame wear clean workwear, a hard hat and a high-visibility vest, with no safety violations.
The videographer's brief. 4K with a log profile, 25 frames per second plus 50-100 for slow motion, a stabiliser, a slider, a telephoto lens for machinery at a distance, their own light for the control rooms, the laboratory and the office, and live sound of the production. Overhead shots - from the high points of the site.
And, as a separate line, requirements for the site itself. The plants and the machinery must be working on the shooting day: an idle plant looks dead on camera. The territory is tidied, the machinery washed, the staff in clean workwear. The client marks in advance on a plan what must not be filmed.
One shooting day
29 October, a Thursday. On site are the photographer Evgenia and the videographer Alexey - working in parallel, across the same locations. The project is run by Angelina.
A working plant means dump trucks under the discharge chute, loaders at the aggregates store and wagons on the track. So the rules of the shoot were written down in advance too:
- the crew works only with an escort from the client;
- the day begins with a safety briefing;
- hard hats, high-visibility vests and closed footwear for everyone, the crew included;
- onto the track and into the machinery working area - only with the escort; near the hot units of the plants - from a safe distance.
By plan, the high-priority zones came first: both asphalt plants, the concrete plant, the rail spur with the cement silos, the bitumen tanks, the machinery fleet. The material also covers everything that makes the complex self-sufficient: the dispatch office with the truck scale, the laboratory, the repair hangar and the machinery storage hangar, the truck wash. And everyday life: the canteen, the dormitory, the office.
Only real employees doing real work are in the frame: an operator at the plant's monitor, a dispatcher at the scale, a lab technician at the press. No staged lines - the picture and the figures tell the story.
The presentation: 24 slides
There is one principle: one object, one slide, its figures. No “about the company” slides and no “our advantages”. The heading names the object; next to it are two or three figures and photographs taken on site.
The order of the slides repeats the order of the investor's questions. First the whole complex on one screen - eight key figures. Then the make-up of the site in a single table. Then the land: 5.85 hectares in ownership, of which 4.48 hectares are the production complex and 1.37 hectares the plot under the rail line. The boundaries are drawn right on the overhead image, so that the area is not a number but an outline.
Next - from raw material to product. The private rail spur: up to 20 wagons of crushed stone and cement in one delivery. The AMMANN Universal 240 asphalt plant - 240 tonnes per hour, a combined gas and diesel burner, electric bitumen heating. The second plant, the TELTOMAT-160, adds another 160 tonnes per hour; together that is 400 tonnes and 18 grades of mix. A bitumen store of 6,000 m³ and 2,000 tonnes of mineral filler. The LOGIK WXL 4/8 concrete plant - 80 m³ per hour, 12 grades of concrete and 6 grades of cement mortar.
Every object has its own page, and on each one is what the photographer saw: the nameplate on the tower, the operator's screen, the drying drum. A figure with no proof in the frame raises questions; a figure next to a photograph of the equipment does not.
The machinery is given not as a general phrase but as a list: a hundred dump trucks, thirty rollers and thirty backhoe loaders, truck mixers, pavers, motor graders, bulldozers, cold planers - with makes and quantities. Then everything that usually stays out of frame, yet matters to a buyer of the base no less than the plants: the dispatch office with the scale, the laboratory with three stages of control, two hangars, the truck wash, a canteen for 100, a dormitory for 200, an office building.
The last content slide is the utilities: 2 MW of allocated capacity, a private gas pipeline 745.2 metres long, a declared gas volume of 7.5 million m³ a year, a gas distribution point. For a working plant this is a question not of convenience but of time: nothing has to be connected.
After the eighteen content slides comes a photo appendix - four pages of eight shots each: both asphalt plants, the concrete plant, the territory and the machinery. Whoever has read to the end wants a closer look - and gets it without captions or text. The presentation closes with the “Make-up of the complex” table: eight rows from which the whole document can be retold in a minute.
The film: 2 minutes 25 seconds
The film repeats the logic of the presentation, only in two and a half minutes and without a single slide. It was shot and edited in 4K; the edit is by Valeria.
It opens with a wide shot of the site and the name. At the fifth second a map appears over the picture: Moscow, the Ring Road, Kotelniki, the Silikat industrial zone - and the caption “1 km from the Ring Road”. The viewer knows nothing about the plants yet, but already understands where this is.
After that the figures follow in the same order as in the presentation - as captions over live footage:
- 400 t/h of asphalt and 80 m³/h of concrete - against the plants themselves;
- the territory - on an overhead image where the 4.48-hectare production complex is outlined;
- up to 20 wagons and four cement tanks of 1,000 tonnes each - over the rail spur;
- two tanks of 3,000 m³ each - over the bitumen store;
- over 100 tonnes - on the display of the truck scale;
- 745.2 metres of private gas pipeline - at the end, before the website address.
A caption is built the same way from start to finish: a large figure or a name and one line of explanation. It sits in the bottom left corner and does not cover what matters in the frame. No graphics for the sake of graphics: they appear only where they carry a fact - the location map and the outlines of the plots.
The figures in the film and in the presentation are the same. This is not a detail: the two materials are almost always viewed as a pair, and a discrepancy in one figure devalues both.
What the client received
A set that shows a production base without a site visit: a 24-slide presentation and a film of 2 minutes 25 seconds in 4K. From the brief to the approved materials took a little over a month: 12 October - the brief, 29 October - the shoot, November - the finished presentation and film.
What works in this set:
- the film answers “what is this and where” before a person opens the document;
- the presentation answers the questions in the order they are asked - from land to gas;
- every figure sits next to a frame taken on site;
- both materials come from one shoot and speak in the same numbers.
And what is needed from the site for such a day to work the first time:
- a contact person with the authority to decide - for the whole shooting day;
- a plan of the territory with the zones and the no-filming areas;
- figures for the slides and captions: capacities, areas, machinery counts;
- working plants, washed machinery and clean workwear;
- passes for the crew and written consent from employees who can be recognised in the frame.
The shoot takes one day. Everything else is preparation, and that is where the time should go: a frame that was not in the shot list will not appear on a slide.
other cases
More equally interesting cases.
FAQ
FAQ.
Yes, we offer full-cycle social media promotion: strategy, content creation, targeted advertising and results analytics.
We give you access to trello/asana where you can see every stage of the work. We also hold regular calls and send progress reports.
Yes, we work with staged payments. You pay for each completed stage according to the approved plan.
Timing depends on the project's complexity. On average a website takes 2 to 6 weeks. We always give exact deadlines before the work starts.
We can work with your content or offer our copywriters to create unique texts and select images.
The price is made up of the scope of work, functionality complexity, design and additional services (content, crm integration, etc.). We provide a detailed estimate broken down by stages.
With an audit: we study the business, the audience and the goals and shape a clear strategy. Then we fix the terms in a contract, agree on the details and start. Results are shown in numbers, and we build the project's growth on them.
You can leave a request at any time - our operators will call you back within a day. The office works on weekdays from 10:00 to 19:00 moscow time.
Still have questions? We may already know the answer
we'll get back to you within one business day

we help businesses grow
Ready to grow?
Leave a request and our managers will get back to you within one business day